Queensland2024
Calliope Open-Cut Expansion
Three-stage pit expansion adding 1.4 km of haul road and lifting daily throughput by 38% without a single lost-time injury.

Three-stage pit expansion adding 1.4 km of haul road and lifting daily throughput by 38% without a single lost-time injury.

Five-year haulage contract running a 12-truck fleet across 90 km of haul road in extreme outback conditions.

Alluvial gold recovery program producing high-purity nuggets and dust from a previously underworked tenement.

Twelve-month drilling and sampling campaign across 28 holes — defining resource for the next decade of operations.

On-site smelting and bar production delivering refined gold dore to bullion-grade specifications.

Secure transport and storage program for refined gold bars produced across three Terranova-operated sites.